Roped In Access were engaged to attend site to remove 2 broken panels of glass and assist onsite glaziers with the installation of new glass.
The glass was externally glazed and the building was looking at a costly job due to having to scaffold the external facade to access the broken panels. We were able to access the areas easily via Industrial Rope Access ensuring a cost effective and quick solution for all parties involved.
Whilst on site we were also tasked with the job of carrying out the annual height safety certification, every anchor was load tested as per Australian Standards and tagged with the digital report handed to the Strata Managers within 24 hours of being on site.
At Roped In Access we work hard to come up with cost efficient solutions that really work, if you have a project that you need looked at feel free to get in touch.